Week 12 (FYP 2)
Activity:
Replace Air Tube Compressor
Objective:
- To fix the broken air tube compressor
- To found out causes of the problem happen
Content:
- The current air tube compressor between air compressor to rotating cylinder was ruptured due to high air pressure as well as the old condition of the tube.
- It cant fix by cover it with tape because the pressure of the air is too high.
- The size of the air tube is internal diameter 4mm and the outside diameter is 6mm
- The new air tube compressor was ordered from Shoppe website.
- The whole air tube on the project need to change due the old condition and can risk of damage.
Result:
- After I change the new air tube compressor, the project was running smoothly.
- The air flow from air compressor in tube was run very well.
Conclusion:
From this situation, I need to check all the component of hardware to make sure there all in good condition to prevent problem like this in future.