Week 5 (FYP 2)
Activity: Connect PLC program to Hardware Objective: To connect the PLC system to the hardware To enable the project to function as programmed To make sure every part of the project works well Content: After the PLC coding is uploaded to the PLC device which is model CQ1MH, the PLC will be connected to the hardware. All output and input wires from the hardware are connected to the PLC The inputs such as start and stop push buttons, proximity sensor and magnetic reed sensors are connected to the input panel of PLC A wire from the COM port on the PLC input and output panel is connected to the busbar of the negative 24VDC. Component PLC Address Result: The PLC was successfully connected unfortunately, the system cannot run automatically even the coding was upload on the PLC device After read the manual, the PLC model used which is CQ1MH cannot run automatically, it needs to be connected to laptop and set to 'run' mode on the CX-programmer software Conclusion Therefore, eve...