Week 5 (FYP 2)

Activity:

Connect PLC program to Hardware

Objective:
  • To connect the PLC system to the hardware
  • To enable the project to function as programmed
  • To make sure every part of the project works well

Content:
  • After the PLC coding is uploaded to the PLC device which is model CQ1MH, the PLC will be connected to the hardware.
  • All output and input wires from the hardware are connected to the PLC
  • The inputs such as start and stop push buttons, proximity sensor and magnetic reed sensors are connected to the input panel of PLC
  • A wire from the COM port on the PLC input and output panel is connected to the busbar of the negative 24VDC.
Component PLC Address

Result:
  • The PLC was successfully connected
  • unfortunately, the system cannot run automatically even the coding was upload on the PLC device
  • After read the manual, the PLC model used which is CQ1MH cannot run automatically, it needs to be connected to laptop and set to 'run' mode on the CX-programmer software

Conclusion  
Therefore, every time I running this project, I need to connect the PLC device to the laptop using sysmac way cable that i borrow from laboratory. 